Corowa Solar Farm
This was completed on behalf of Metka. The project included bulk earthworks, drainage, road construction and concrete pier construction.
This was completed on behalf of Metka. The project included bulk earthworks, drainage, road construction and concrete pier construction.
This project was completed on behalf of the Albury City Council. The project involved the installation of 8km of pipework ranging from 450mm and 300mm DICL pipe, 300mm, 250mm and 200mm PVC pipe. There was multiple HDD bores and sleeved bores using mild steel pipe. Parts of the project were constructed through rock and sensitive vegetation areas.
We completed this project for North East Water. This involved the supply and installation of 11.3km of 150mm pipe, air valves, scour valves, 130,000lt storage tank and 2 pump stations.
This project was completed on behalf of The Greater Hume Shire. This consisted of the removal of the existing kerb, footpath and roadway on both sides of the main street. We then installed all new drainage, kerb, street furniture, paving, concreting and asphalt foot paths.
This 12 lot industrial sub division was completed on behalf of The Greater Hume Shire. It consisted of bulk earthworks, sewer and water reticulation, drainage, road construction and utilities such as power and Telstra.
This project was completed on behalf of The Greater Hume Shire. It consisted of the installation of new drainage, kerb and gutter, footpaths, feature concreting and the replacement of the existing roadway.
This project was completed on behalf of North East Water. It consisted of 3km of 300mm sewer rising main, multiple bores and two connections into existing mains.
We were engaged by The Greater Hume Shire. The project consisted of 1500mts of 150mm and 225mm gravity sewer at depths up to 6mt along with 18 cast in situ manholes. It also included a 200mt rising main. Parts of this project were completed in residents back yards and within road ways.
Project included the installation of sewer, water and drainage reticulation along with other assets such as comms, gas and electricity. The construction of a new road which included lime stabilising of the subgrade and asphalting.
This project was completed under the supervision of MIL and Eartech. Our tasks included the demolition of existing channel boards, de-silting channels, installation of new automatic gates and rock beaching.