Jude St subdivision

12 Lot subdivision – Jude St Howlong

Posted on November 17, 2015April 5, 2016 by Bill

Project included the installation of sewer, water and drainage reticulation along with other assets such as comms, gas and electricity. The construction of a new road which included lime stabilising of the subgrade and asphalting.

Posted in Bulk earthworks, Road construction, Stormwater drainage
Channel modernisation - culvert

Channel modernisation – Jerilderie area

Posted on November 17, 2015December 22, 2015 by Bill

This project was completed under the supervision of MIL and Eartech. Our tasks included the demolition of existing channel boards, de-silting channels, installation of new automatic gates and rock beaching.

Posted in Bulk earthworks
Erosion control

Erosion control – Murray River

Posted on November 17, 2015December 23, 2015 by Bill

We have completed numerous projects along the Murray river. Our tasks include remediating the eroded banks by placing rock along the effected areas. Each site is treated as an environmentally sensitive area.

Posted in Bulk earthworks
Tennis court construction

Tennis Court Construction – Rennie/Hopefield

Posted on November 17, 2015December 23, 2015 by Bill

Our tasks included site preparation, importation and placing of material for the construction of the court. Laser levelling surface on grade and the installation of the net and lines.

Posted in Bulk earthworks, Laser levelling

Posts navigation

Newer posts →

Categories

  • Bulk earthworks (6)
  • Concrete pavement construction (1)
  • Laser levelling (1)
  • Previous Experience (1)
  • Pump stations (1)
  • Road construction (5)
  • Sewerage reticulation (3)
  • Stormwater drainage (1)
  • Water reticulation (3)
Based in Albury, NSW
admin@longfordcivil.com.au
0438 391 850 (Bill) or 0429 506 701 (Brendan)